威尼斯人注册送56元

LOCATION:HOME > NEWS > NOTICE BULLETIN

Congratulations
TIME:2018-10-24 15:17:42      CLICKS:109

China Coal Fifth Construction Co., Ltd.:

    

    From May 21st to June 20th, 2017, the third engineering office of your company created a 188m high performance in the construction of the new main shaft project in the hard granite area, which was the highest in the vertical drilling of Shandong Gold Group Co., Ltd. Record!

    

    Since the third engineering office has been stationed in the Xincheng gold mine project, the members of the project team have set an example and led all the staff to work hard, grasp safety and ensure quality. The construction of the three main wells of the main, auxiliary and wind has gone hand in hand, and many times the shaft has been created for more than 100 meters. The footage has fully demonstrated the elegance of the “National Championship Team for Vertical Construction”.

    

    In the construction of the return air well project, the office has established a good image of “Ace Army”. Through scientific organization, advanced planning and careful construction, it has repeatedly achieved a 100-meter break in the Yuecheng well, with a maximum footage of 160 meters, which was completed safely and with high quality. The scheduled schedule has laid a solid foundation for better and faster construction of our mine. As part of the project, our mine will hold a full-scale on-site meeting to learn advanced experience.

    

    During the construction of the auxiliary well project, the project department overcomes the unfavorable factors such as large water inflow from the wellbore and complicated geological conditions. By strengthening construction management and optimizing the construction process, the highest record of shaft construction has been established since the start of the auxiliary shaft in May this year. It has been improved by 3 times, which has reversed the slow construction of the sub-well under special hydrogeological conditions.

    

    Here, I would like to express my congratulations on your achievements and express my gratitude to you for your contribution to the New Town Gold Mine. I sincerely hope that we will work together to further deepen the cooperation between the two sides and promote the sustainable and healthy development of the New Town Gold Mine and realize the strategic goal of Shandong Gold. New and bigger contribution!

Shandong Gold Mining Co., Ltd.

Xincheng Gold Mine

June 21, 2017

   

RECOMMENDING NEWS
PREV:Announcement on the use of China Coal Fifth Construction Co., Ltd.
NEXT:China Coal Fifth Construction Co., Ltd. video conference equipment inquiry announcement

RETURN

Copyright ? 2018 All Rights Reserved : CHINA COAL NO.5 CONSTRUCTION CO.,LTD

Platform: Design: